Sarah Senior Designer at Remodel West

Recently we finished a large-scale interior kitchen and bath remodel in Cupertino California.  The project involved re-designing the kitchen, hall bath and master bath which included moving walls and intricate design details.  Sarah Spiroff, CKD, CBD and Senior Designer at Remodel West was instrumental in all the design work and details.

Our customer took the time to write the following review to share their experience with our company and we really appreciate it.  If you are a LinkedIn member you may visit our page and see the posting or you may see it below.

As posted in www.linkedin.com Remodel West profile. 

March 31, 2010   Top qualities: Great Results, High Integrity, Creative   “Considering this contractor is a must for anyone planning a remodeling project. Having recently completed a major remodel of our home by Remodel West we could not be happier. While they offer separate construction project services, we elected to contract them to handle everything from A to Z. We were so impressed by the professional and thorough approach which they proposed and their job operating rules that we did not even bother to get competitive quotes. Our initial impressions were borne out and even exceeded. The scope of this project included remodeling our kitchen, family room, hall bath and master bath, as well as replacing all interior doors and jams. Interior walls were moved to enlarge the kitchen and master bath, reducing the size of the hall bath and master bedroom (we did not expand the size of the home). The designers were knowledgeable and experienced, as well as patient and good listeners. They helped us immensely with considering several design alternatives, material and feature selections, going shopping with us as needed, and saved us from the bewilderment of choosing from the multitude of options available. For decisions where we were somewhat hesitant, such as room color, tile and granite selections, we trusted their judgment and were very pleased with the end results. The construction crews were without exception a joy with whom to work; before long they were almost like members of our family. The way they interacted with us, among themselves, with the city inspectors and with their subcontractors demonstrated their common commitment to professional behavior, excellence of workmanship and customer satisfaction. We were totally comfortable that the work would be done right whether or not we were present. As the estimated length of the project was 6 months, they used a dual-phased approach which allowed for our continuing to live in our home the entire time. The phase involving our kitchen had us using half of the unheated garage for meals, so planning that during the summer was a must. The actual project length was two months longer than the estimate, mostly due to mid-project changes we requested, some glass supplier quality issues, and an unforeseen new requirement from the Cupertino Sanitary District. Scheduling was well documented with MS Project charts; communication of the few scheduling delays that occurred could have been a little timelier.”   ~Bill Hobdy

Before

After

 

About the author
Leave Comment